中文

Consensus Tracking of Multi-agent Systems with Time-delays Using Adaptive Iterative Learning Control

Hits:

  • Abstract:In the technical note, consensus tracking is studied for multi-agents system(MAS) with state time-delays. Every agent of the MAS has homogeneous dynamic function, which is described by a nonlinearly parameterized functions with unknown state time-delays. Moreover, it is assumed that the virtual leader(regarded as the desired trajectory) can be accessible to at least one agent. Based on several necessary assumptions, a distributed adaptive ILC is designed. In order to prove the convergence of tracking error, a composite energy function is designed. The result of convergence analysis shows that the designed control strategy can guarantee the agents track virtual leader along the iteration axis. A numerical simulation is provided to illustrate the effectiveness of the adaptive iterative learning controller.

  • Translation or Not:no


Laoshan Campus-99 Songling Road, Qingdao City, Shandong Province
Sifang Campus-No.53 Zhengzhou Road, Qingdao City, Shandong Province
Sino-German International Cooperation Zone (Sino-German Campus)-No. 3698 Tuanjie Road, West Coast New District, Qingdao City, Shandong Province
Gaomi Campus-No. 1 Xingtan West Street, Gaomi City, Shandong Province
Jinan Campus-No. 80 Wenhua East Road, Jinan City, Shandong Province ©2015 Qingdao University of Science and Technology
Administrator email: master@qust.e
Click:
  MOBILE Version

The Last Update Time:..